Vela Systems, Inc.
Construction happens in the field — Manage it™
Customer Login

Case Study Download

 

Vela Systems links data, files and photos to BIM streamlining the commissioning and handover process.

Tekla BIM streamline commissioning and handover

Hospital Case Study: Barton Malow Company

Connecting BIM to Commissioning, Handover and Operations

Summary:
Barton Malow leveraged Vela Systems field software integrated with Tekla BIM to streamline commissioning and create a BIM-enabled handover deliverable to the Owner Maryland General Hospital for use in ongoing operations.

Project:
Maryland General Hospital's (Baltimore, Maryland) Central Care Expansion, a new five-story building attached to the existing hospital includes 15,534 sq. ft. of renovated space and 77,000 sq. ft. of new space.

Products Used:
Vela Systems Field BIM for Commissioning, Handover and Operations, Tekla Structures for Construction Management (BIM).

Benefits:

  • Created electronic handover documentation for the owner as a "digital asset."
  • Reduced time required for commissioning to shorten handover periods.
  • Enhanced quality and reduced risk through a consistent, accurate and auditable approach.

(* required field)

Download Case Study

First Name *
Last Name *
Company *
Email *
Phone *
City *
State/Province *
Country *
Company Type *
(Hold CTRL key
to select multiple)
Subscribe to Vela Systems
Quarterly Newsletter: